HOSIDEN VIETNAM (BAC GIANG) EXTENSION FACTORY PROJECT
The HOSIDEN VIETNAM (BAC GIANG) Extension Factory Project is located at Lot C (C6), Quang Chau Industrial Park, Nenh Ward, Bac Ninh Province, Vietnam. With a total floor area of 30,000 m², the project is developed by HOSIDEN VIETNAM (BAC GIANG) CO., LTD. and is scheduled for implementation from 2025 to 2026, ensuring high standards in construction quality, schedule, and operational efficiency.
Project category:


